Preparation of Revised Feasibility Report
For the capacity increase request, a Revised Feasibility Report is prepared in five copies. This report details the capacity increase and Archimedes Screw Turbine System integration within the scope of the existing generation license. The report is to DSI along with a receipt showing that the current report review fee has been paid.